FLUID-APPLIED Silicone Membrane
FOr ANY FLAT ROOF

 
 
cover-photo-mod-bit.jpg
 
 
 
 
fabric.jpg
 
 

FLUID-APPLIED SEAMLESS SILICONE FLAT ROOF SYSTEM

A Brubacher Roofing Fluid-Applied Seamless Silicone Roof System can be used in the restoration of most types of commercial and industrial flat roofs, including Tar & Gravel, Modified Bitumen, TPO, EPDM and PVC. Our silicone restoration system is a fluid-applied solution that is fully adhered to your existing commercial flat roof. The result is a long lasting, fully adhered, fully reinforced, seamless membrane with superior weatherability.

 
 
 
 

SILICONE SYSTEM BENEFITS

 
 
liquid.png

SEAMLESS MEMBRANE

95% of roof leaks on single ply membranes are due to failure of seams. Our fluid applied systems are monolithic. No seams. No Leaks.

money.png

COST EFFECTIVE

Our restoration systems are generally half the cost of roof replacement. This allows you to upgrade twice the roof coverage on the same budget.

 
 
no-tear-off.png

NO TEAR OFF REQUIRED

Eliminating any interference with production save you money and keeps unnecessary waste out of our landfills.

energystar_logo.png

Energy Star Approved

The white, reflective finish reduces cooling costs during the summer.

infinit.png

LIFETIME SOLUTION

Only the silicone top coat needs to be re-applied to renew your minimum 20 year warranty.

UV STABILITY

Unlike traditional roofing systems, our silicone solution will not break down from UV exposure.

 
 
 
 

SILICONE FLAT ROOF SOLUTION

EACH YEAR, MILLIONS OF DOLLARS ARE WASTED IN THE PREMATURE TEAR OFF OF FLAT ROOFS. IN MOST CASES, A PROPER RESTORATION CAN BE A PERMANENT, LOWER COST SOLUTION TO ROOF LEAKS.


 
 
Brush4.jpg
 

TAR & GRAVEL ROOF RESTORATION PROCESS

STEP 1
The loose gravel material is removed from the roof using an industrial vacuum system.

STEP 2
The roof is then planed to a smooth finish and thoroughly cleaned.

STEP 3
Problem areas are patched using asphalt.

 

STEP 4
An acrylic primer base coat is applied.

STEP 5
Liquid silicone and polyester fabric is used to patch the roof perimeter edge and all rooftop protrusions.

STEP 6
A thick base layer of silicone is applied to the entire roof.

 

STEP 7
A layer of polyester fabric is rolled out and overlapped to give the new silicone membrane extra strength.

STEP 8
The fabric is then covered with another layer of silicone, adding a watertight seal.

Brubacher Silicone Roofing Timeline.00_00_13_42393.Still005.jpg

STEP 9
A final top coat of silicone is applied.

 

Mod Bit/Single Ply ROOF RESTORATION PROCESS

STEP 1
We clean the entire roof surface using specialized pressure washing equipment.

STEP 2
The dirty water is then removed from the roof and the roof is then dried to prepare the surface.

STEP 3
We apply a single ply primer coat as required.

 

STEP 4
We patch all identified problem areas.

STEP 5
We used liquid silicone and polyester fabric to seal the perimeter of the roof as well as all rooftop protrusions.

STEP 6
A thick base layer of silicone is applied to the entire roof.

 

STEP 7
A layer of polyester fabric is rolled out and overlapped to give the new silicone membrane extra strength.

STEP 8
The fabric is then covered with another layer of silicone, adding a watertight seal.

STEP 9
A final top coat of silicone is applied.


 
 
 
 
 
 

Contact us for a Free Roof Inspection and Consultation


 
 
Roof.jpg